Metrics
8 views
2 downloads
Image
[Completed library first floor with second floor under construction]
View of the constructing of Kennedy Library. The first floor structure is complete, while the second floor is under construction. The crane and other construction materials are present.
Items
Thumbnail | File information | Actions |
---|---|---|
|
ua0079-75e3ef1993a55268f79c960c7552240c.jpg Public
|
Download |